Load Test On Piles

  • 89.0K views
Up next
Amazing 3D Staircase Risers decoration

    Load tests on piles are conducted on completion of 28 days after casting of piles. Two types of tests namely initial and routine tests, for each type of loading viz. vertical, horizontal (lateral) and pull out, are performed on piles.

    Initial Load Tests on Piles

    This test is performed to confirm the design load calculations and to provide guidelines for setting up the limits of acceptance for routine tests. It also gives an idea of the suitability of the piling system. Initial Test on piles are to be carried out at one or more locations depending on the number of piles required. Load applied for the initial (cyclic) load test is 2.5 times the safe carrying capacity of the pile. Loading for Initial Tests is conducted as per Appendix ‘A’ Clause 6.3 of IS-2911 Part IV.

    Routine Load Tests on Piles

    Selection of piles for the Routine Test is done based on number of piles required subject to maximum of  ½% of total number of piles required. The number of tests may be increased to 2% depending on the nature / type of structure. The test load applied is 1½ times the safe carrying capacity of the pile. The Maintained load method as described in Clause 6.2 of IS-2911 (Part IV) – 1985 shall be followed for loading for the Routine Tests.

    This test will be performed for the following purposes:

    1- To ensure the safe load capacity of piles

    2- Detection of any unusual performance contrary to the findings of the Initial Test.

    The tests shall be performed at the cut-off level only. A detailed report for the test result is prepared.

    1- Vertical Load Tests on Piles

    This test will be carried out as stipulated in IS-2911 (Part IV) 1995.

     

    Pile Head: The pile head shall be chipped off till sound concrete is met wherever applicable. The reinforcement shall be cut and head levelled with Plaster of Paris. A bearing plate with a hole shall be placed on the head for the jack to rest.

    Reaction: Kentledge shall be suitably designed to get the desired reaction on the piles. Anchor piles (if required) shall be placed at a center to center distance of 3 times the pile diameter subject to a minimum distance of 2 M.

    Settlement: 2 dial gauges for a single pile and 4 dial gauges for a group of piles with 0.01 mm sensitivity shall be used. They shall be positioned at equal distance around the piles on datum bars resting on immovable supports at a distance of 3D (min. of 1.5 m) where D is the diameter of pile or circumscribing circle for non-circular piles.

    Application of load: It shall be applied as specified depending on the type of test (routine / initial). Each load shall be maintained till the rate of displacement of the pile top is either 0.1 mm in the first 30 minutes or 0.2 mm in the first one hour or 2 hours whichever occurs first. The next increment in the load shall be applied on achieving the aforesaid criterion. The test load shall be maintained for 24 hours.

    Initial Tests: The safe load on a single pile shall be the least of the following:

    1-  2/3rd of the final load at which the total displacement attains a value of 12 mm unless otherwise required in a given case on the basis of nature and type of structure in which case, the safe load should be corresponding to the stated total displacement permissible.

    2-  50% of the final load at which the total displacement equals 10% of the pile diameter in case of uniform diameter piles or 7.5% of the bulb diameter in case of under reamed piles.

    2- Lateral (Horizontal) Load Tests on Piles

    The jack should be placed horizontally, between two piles. The load on the jack shall be the same on both the piles. The load will be applied in increments of 20% of the estimated safe load and at the cut off level. The load will be increased after the rate of displacement is nearer to 0.1 mm per 30 minutes. If the cut-off level is approachable, one dial gauge exactly at the cut-off level shall measure the displacement. In case the cut-off level is not approachable, 2 dial gauges 30 cm apart vertically, shall be set up and the lateral displacement of the cut-off level calculated by similar triangles.

    The safe load on the pile shall be the least of the following:

    a) 50% of the final load at which the total displacement increases to 12 mm.

    b) Final load at which the total displacement corresponds to 5 mm.

    3- Pull out Tests on Piles

    Specified by ASTM standard D3689, axial uplift pile load tests ( pull out  tests) have become the most common pile load tests in the solar industry.  By applying a vertical tensile load and simultaneously measuring pile displacement, engineers can determine the minimum overall embedment that’s required to account for design loading.  Additionally, this test is often used by contractors and developers during pile installation as a means of verifying successful pile installation.  If your project needs axial uplift pile load tests (pull out tests)

    0 0 votes
    Article Rating
    Subscribe
    Login
    Notify of
    guest
    guest
    1 Comment
    Newest
    Oldest Most Voted
    Inline Feedbacks
    View all comments
    You May Also Like

    31+ Crazy Houses Without Engineers

    Fails in construction are rare but when it happens don’t you wonder…
    • 2.5M views

    Why Bamboo Is More Stronger Than Steel Reinforcement?

    Bamboo has quite a high tensile strength. It is comparable with steel.…
    • 1.6M views

    35+ Photos Showing The Ultimate Stair-Making Skills

    Construct stairs is not just a phrase people use to show they…
    • 946.1K views

    Reinforcement Detailing Of Isolated Footing

    There are different types of foundation based on no. of a factor.…
    • 816.8K views
    Engineering Discoveries
    Developed by Engineering Discoveries
    wpDiscuz
    Manage Consent
    To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
    Functional Always active
    The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
    Preferences
    The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
    Statistics
    The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
    Marketing
    The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
    Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
    View preferences
    {title} {title} {title}