For economic safe and quick construction of tunnels, the following precautions should be taken:

1- The shape of the tunnel should be decided according to its purpose.

2- Cross-sectional dimensions of the tunnel should be decided to achieve economy in its construction.

3- Economic calculations for the extent of equipment and labour should be made before starting the tunnel construction.

4- The pattern of blasting the material in different locations should be decided for maintaining the speed of driving and safety.

5- The sequence of operations must be decided so that the proper use of labour and equipment is made.

6- Labour should be well organized to maintain continuous progress of the tunnelling operations.

7- Outdated or unsuitable tools should not be used.

8- Care should be taken to see that every operation is completed at the scheduled time.

9- The Excavated material should be piled up in a manner suitable to the method of loading being employed.

10- loading and hauling of muck should be carried out efficiently.
11- The sequence and type of lining should be determined in advance to achieve economy.
12- Selection of multipurpose and uniform type of equipment should be made, according to the size and shape of the tunnel.

Share this
0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Newest
Oldest Most Voted
Inline Feedbacks
View all comments